Reconstruction of Kelč Primary School

The reconstruction of the historic elementary school building in Kelč was designed to be implemented in stages according to the importance of the existing construction problems. Priority was given to the reconstruction of the school kitchen to meet legislative and operational requirements.

A separate construction stage was the general repair of the facades of the historic building, including plastering and final painting of the facades. Technical measures were designed and implemented to reduce the moisture content of the building’s external walls.
The completion of the building modifications included the design and implementation of new student changing rooms in the existing space of the so-called old gymnasium, the reconstruction of the gymnasium was completed in the part of the technical works related to the repair of its floor.

CLIENT: City of Kelč
PROJECT REALIZATION: 2004 – 2006

 

SCOPE OF WORK:

  • Project documentation for zoning decision
  • Project documentation for building permits
  • Implementation documentation
  • Processing of the zoning decision
  • Execution of the building permit